Gold Member Since 2013
Audited Supplier
Lyfoo Industry Co., Ltd.

Aluminum Gantry Crane, Portal Crane, Light Weight Crane manufacturer / supplier in China, offering Low Weight Aluminum Folded Portal Crane Adjustable Legs and Beam 1t 2t, Portal Crane Adjustable Legs 1t 3t 5t, Electrical Manual Gantry Crane with Wheels 1t 2t 3t 5t and so on.

(/ )

Supplier Homepage Product Manual Gantry Crane Low Weight Aluminum Folded Portal Crane Adjustable Legs and Beam 1t 2t

Low Weight Aluminum Folded Portal Crane Adjustable Legs and Beam 1t 2t

FOB Price: US $2,500 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $2,500/ Piece
Get Latest Price
Port: Tianjin, China
Production Capacity: 50000peice Per Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: LYFOOCRANE
  • Weight: Handreds Kilograms
  • Capacity: 1ton
  • Lifting Height: Adjustable
  • Trademark: LYFOOCRANE
  • Specification: 1t
  • Color: Aluminum
  • Size: Customized
  • Beam Width: Adjustable
  • Using Environment: Factory Concrete Floor
  • Transport Package: Wooden Box
  • Origin: China
Product Description
This type aluminum portal crane is special desged for lifting material at different environment,it is made of aluminum which is very light in weight, that the lifting legs can be adjustable and span can be adjustable, also it is can be folding, take it just need one or two person. this feature is the most superiority, most people would like to take it at truck load and unload materials.

About aluminum portal crane, we can according to your requirement what measrement you need to manuafacture the goods, also all of our products manufactured according to national standard to guarantee the safety and durable of goods. 

Safety and Installation
Take notes before installation:
once the crane has been shipped to the destination,check according to the packing list to see if any damages or deforms.If yes,try to repair it.
The installation floor should be stable and smooth.

Installation Method I :
Assemble the two side leg and ground beam properly on the floor.
Brake the wheel and lift the end of the leg to 60 degree.Lift one side of the beam.Join the flanges.
Assemble the flanges by high-strength bolts,spacers and spring washer.Fasten those parts.
Lifting the finished beam and lay to the other side legs.Repeat the step 3.
Assemble the hoist to the beam and make the hoist is safe and workable.
Install the festoon system if the hoist is electrical type.
Install the electrics between the motors and electrical box.Till now,the installation is finished.
Installation Method II:
Assemble the two sides legs and them the ready.
Brake the wheels.Put the 2 legs parts to proper position according to the beam length.
Put the beam to the proper position and match the flanges between the beam and leg.
Assemble the flanges by the high-strength bolts,spacer,spring washer and nuts.Fasten those parts.
After assembling,lift the whole crane to up strait by worker or by lifting equipment.
Install the hoist to the beam.
Install the festoon system and electrics if the hoist is electrical type.
Send your message to this supplier
Avatar
Miss Olina
Business Manager
*From:
To: Miss Olina
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now