Aluminum Manual Portable Gantry Crane Light Weiht, Good Quality

Certification: CE, ISO9001
Condition: New
Maximum Lifting Weight: <20t
Maximum Lifting Height: 15-20m
Operation Form: Crane Console
Type: Common Gantry Crane
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
Aluminum PT-3
Main Girder Form
Single Girder
Feature
Light Weight
Advantage
Completely Foldable
Capacity
0.5-5t
Lifting Height
3-6m
Transport Package
Strong Wooden Box
Specification
Aluminum
Trademark
LYFOO
Origin
Henan
Production Capacity
50000peice Per Year

Product Description

                               Aluminum single girder gantry crane

This crane is mainly designed for material handing work in the assembling workshop,machining workshop,mold assembly,research laboratory,maintenance,small cargo terminal,warehouse,car repair center,etc.

All parts of the aluminum crane is foldable and it is very light. one person can carry it to everywhere.

Many options: 
The crane contains traveling system,steel structure,control system,hoist system.The traveling system can be dived by castor wheel type,rail type and electrical drive type.The steel structure can be full or part disassembly.The hoist can be electrical hoist or manual chain block.

Safety and Installation
Take notes before installation:
once the crane has been shipped to the destination,check according to the packing list to see if any damages or deforms.If yes,try to repair it.
The installation floor should be stable and smooth.

Installation Method I :
Assemble the two side leg and ground beam properly on the floor.
Brake the wheel and lift the end of the leg to 60 degree.Lift one side of the beam.Join the flanges.
Assemble the flanges by high-strength bolts,spacers and spring washer.Fasten those parts.
Lifting the finished beam and lay to the other side legs.Repeat the step 3.
Assemble the hoist to the beam and make the hoist is safe and workable.
Install the festoon system if the hoist is electrical type.
Install the electrics between the motors and electrical box.Till now,the installation is finished.

Installation Method II:
Assemble the two sides legs and them the ready.
Brake the wheels.Put the 2 legs parts to proper position according to the beam length.
Put the beam to the proper position and match the flanges between the beam and leg.
Assemble the flanges by the high-strength bolts,spacer,spring washer and nuts.Fasten those parts.
After assembling,lift the whole crane to up strait by worker or by lifting equipment.
Install the hoist to the beam.
Install the festoon system and electrics if the hoist is electrical type.

Some Technical Parameter
TypeCapacity(t)Height(m)Span(m)Beam(mm)
PT3-0.50.53-9m3-9m140
PT3-11160
PT3-22160
PT3-33200
PT3-55250

Our service
1.We provide free training and provide free document ragarding to using ,maintenance and repairing .etc.
2.We can send technician to go to site for instruction and technical service upon request.
3.The guarantee is 12 months from the day that the crane start to run property within this period ,any problem due to the manufacturing reason,will be slolved by us at free of charge.After 12 month,we will continue provide good service and only charge spare part cost.
4.We provide 24-hour telephone service.

 

Send your message to this supplier

*From:
*To:
avatar Mr. Alan
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now